An update on the list: ** Items highlighted in red are updated 5/18 at 9:20 pm
1. Sanding the woodwork, 2. Priming the walls 3. Painting the ceiling (2-3 coats) (5/18) 4. Painting the walls (2 coats) (5/18) 5. Painting the woodwork (3 coats) 6. Spackling the bathroom walls (contractor) 7. Sanding the woodwork in the bathroom 8. Priming the bathroom walls (5/13) 9. Painting the bathroom wood work, ceiling and walls (5/18) 10. Laying the floor (contractor) 11. Installing the vanity, mirror, light & towel racks 12. Installing the toilet(still to be purchased) (5/18) 13. Installing the shower door (contractor) 14. Put ceiling fan back on, change out old outlets and switches, hang shades, put doors back on
When you're writing your post, click on the "edit HTML" tab. Find the works you want to strikethrough, on the left of the word(s) put < del > and then on the right, put < /del > (both without the spaces). Click back on Compose to see if it worked.
I am a 38 year old mother of 3. I grew up in the Philly suburbs(where we live now), went across the state to GCC where I graduated with an education degree, and a husband. I spent the next 3 1/2 years teaching elementary school before starting my current job, as SAHM. My eldest daughter, E was born in 2001. She was followed by my son, N in 2004, and then our baby girl, K in 2007. I started blogging on xanga when N was 1, mainly to keep friends and family members updated on the minutia of our lives. I ended up moving to Blogger in 2007. I am not a consistent blogger, but I try to do updates throughout the year.
4 comments:
Looking good!
Here's how you do a strikethrough:
When you're writing your post, click on the "edit HTML" tab. Find the works you want to strikethrough, on the left of the word(s) put < del > and then on the right, put < /del > (both without the spaces). Click back on Compose to see if it worked.
nice!
You're awesome! I can't wait to see the finished project and YOU!!! Thanks for working hard for us. :)
Good progress!
Post a Comment