Progress, Progress
An update on the list:
** Items highlighted in red are updated 5/18 at 9:20 pm
1. Sanding the woodwork,
2. Priming the walls
3. Painting the ceiling (2-3 coats) (5/18)
4. Painting the walls (2 coats) (5/18)
5. Painting the woodwork (3 coats)
6. Spackling the bathroom walls (contractor)
7. Sanding the woodwork in the bathroom
8. Priming the bathroom walls (5/13)
9. Painting the bathroom wood work, ceiling and walls (5/18)
10. Laying the floor (contractor)
11. Installing the vanity, mirror, light & towel racks
12. Installing the toilet (still to be purchased) (5/18)
13. Installing the shower door (contractor)
14. Put ceiling fan back on, change out old outlets and switches, hang shades, put doors back on
4 comments:
Looking good!
Here's how you do a strikethrough:
When you're writing your post, click on the "edit HTML" tab. Find the works you want to strikethrough, on the left of the word(s) put < del > and then on the right, put < /del > (both without the spaces). Click back on Compose to see if it worked.
nice!
You're awesome! I can't wait to see the finished project and YOU!!! Thanks for working hard for us. :)
Good progress!
Post a Comment