Progress, Progress

An update on the list:
** Items highlighted in red are updated 5/18 at 9:20 pm

1. Sanding the woodwork,
2. Priming the walls
3. Painting the ceiling (2-3 coats) (5/18)
4. Painting the walls (2 coats)
5. Painting the woodwork (3 coats)

6. Spackling the bathroom walls (contractor)
7. Sanding the woodwork in the bathroom
8. Priming the bathroom walls (5/13)
9. Painting the bathroom wood work, ceiling and walls (5/18)
10. Laying the floor (contractor)

11. Installing the vanity, mirror, light & towel racks
12. Installing the toilet (still to be purchased) (5/18)
13. Installing the shower door (contractor)
14. Put ceiling fan back on, change out old outlets and switches, hang shades, put doors back on


Amy said...

Looking good!

Here's how you do a strikethrough:

When you're writing your post, click on the "edit HTML" tab. Find the works you want to strikethrough, on the left of the word(s) put < del > and then on the right, put < /del > (both without the spaces). Click back on Compose to see if it worked.

chaps said...


EEEEMommy said...

You're awesome! I can't wait to see the finished project and YOU!!! Thanks for working hard for us. :)

Becky said...

Good progress!